The study is just about done now. The book cases on the south wall are install (sans shelfs - that should be in next week), the seat for the window seat is complete and the cap piece on the wainscotting is done. For the most part, all that remains of the study is putting the back banding around the doors/windows, finishing the wood, installing the door hardware, refinishing the floor and hooking up the electrical.
The living room north wall is completed. The front door is installed (though no actual hardware on it yet!) and the window and front door trim and wainscotting is complete. Some additional trim work was done on the columns - minor but nice trim at the top and bottom of the columns.
The fireplace is hooked up and works (yeah!) Now we still need to trim it out, but at least is works now. We did have a gas leak for a while, but that was eventually fixed.